BHP required the pathways around their Mine Plants to have a firm, level, well-draining surface to keep the workers out of the mud in periods of wet weather.

Title
The problem
Long Text
  • The area was levelled
  • Diamond Grids were laid
  • Diamond Grids were filled with 12mm gravel.
Title
The solution
Subtitle
BHP Billiton
Excerpt
BHP required the pathways around their Mine Plants to have a firm, level, well-draining surface to keep the workers out of the mud in periods of wet weather.